Project Name: Plantation Baptist Church Parking
Project Timeline: October – November 2020
Completion Date: 11/11/20
Address: Plantation, FL
Supplier:
General Contractor: Plantation Baptist Church
Sub-Contractor: Warrens Concrete
Owner: Plantation Baptist Church
Engineer: AJ Hydro
Size: 8,500 sf
Mix (psi):
4,000 psi
Links: 

 
Cemex brought a paving engineer on location in early 2019. Concrete was proposed for the project along with the benefits. They really liked the pros of concrete including its longevity, lighting and low maintenance. This 165 space parking lot project was completed over 6 weeks and was 1,115 C/Y of concrete including the curbing.
 