casino trực tuyến w88

Project Name: University of South Florida Judy Genshaft Honors College
Project Timeline: 7 Months
Completion Date: 01/22
Address: University of South Florida – Tampa
Supplier: Preferred Materials, Inc.
Owner: University of South Florida
General Contractor: The Beck Group
Sub-Contractor: Ceco Concrete Construction
Mix: 4000 PSI
Size/Area: 85,000 sq/ft

Application: Education
Website Link:

The Judy Genshaft Honors College, a five-story, 85,000-square-foot facility located on the University of South Florida, Tampa campus. The project consisted of 6000 cubic yards of concrete.

cá cược bóng đá cá cược bóng đá trực tuyến cá cược bóng đá 88 cá cược bóng đá f88 cá cược bóng đá châu âu